News
Products
  • 09
    Oct

    Drilling Waste Project Department in Wushen County, Inner Mongolia that the specific gravity of mud treated by KOSUN water-base drilling waste management system realized "zero discharge of drilling waste" and minimized the waste discharge amount....

  • 29
    Sep

    Recently, KOSUN hears another good news from the South American market that KOSUN reaches a supply agreement of Black Rhino decanter centrifuges with an important customer in South America through nearly two-month negotiation and communication....

  • 24
    Sep

    This time, the order for solids control system is placed by a regular customer of KOSUN in Russia, and eight years have gone by since the first cooperation between both sides in 2007....

  • 22
    Sep

    Recently, KOSUN Jingwei Factory is preparing for the latest shipment of supporting drilling mud solids control equipment to assist the smooth implementation of new drilling contract of Russian drilling company....

  • 17
    Sep

    On August 27, 2015, KOSUN drilling waste management system formally entered an oilfield in Xinjiang and began to accept the test from September. Through a two-week test, the drilling cuttings and fluids treated by such systems achieved “Zero Discharge of Drilling Waste”, effectively reducing the discharge amount of drilling waste....

  • 16
    Sep

    As drilling mud solids control industry insiders know that mud tank is the basic equipment in solids control system and drilling waste management. ...

Copyright 1992- by KOSUN Group All rights reserved.
All rights reserved Branch Xun mechanical layout and content of this website shall not be reproduced without written authorization and modeled